Residential electricians use this workflow to draft a service load calculation worksheet for a 200-amp upgrade on a 1974 house that is adding an EV charger and a heat pump. Older services often look fine until the heat pump and charger are added together. The draft is arranged so a licensed person can review it against NEC Article 220 and the local amendment. It is not a signed inspection, a code determination, or a price commitment.

When to use it

Use this when you need a service load calculation worksheet and the job matches this situation: a 200-amp upgrade on a 1974 house that is adding an EV charger and a heat pump.

What to gather first

  • general lighting
  • small appliances
  • laundry
  • fixed appliances
  • HVAC
  • EV charger
  • demand factors

How to check the draft

Older services often look fine until the heat pump and charger are added together. Compare each line with NEC Article 220. If a section number was not taken from the book or the adopted code, mark it unverified.

What this page does not do

It does not replace a permit, a manufacturer instruction, or the judgment of the person who signs the document. Northline Electric in the sample is an illustration, not a real firm.