Residential electricians use this workflow to draft a service load calculation worksheet for a 200-amp upgrade on a 1974 house that is adding an EV charger and a heat pump. Older services often look fine until the heat pump and charger are added together. The draft is arranged so a licensed person can review it against NEC Article 220 and the local amendment. It is not a signed inspection, a code determination, or a price commitment.
When to use it
Use this when you need a service load calculation worksheet and the job matches this situation: a 200-amp upgrade on a 1974 house that is adding an EV charger and a heat pump.
What to gather first
- general lighting
- small appliances
- laundry
- fixed appliances
- HVAC
- EV charger
- demand factors
How to check the draft
Older services often look fine until the heat pump and charger are added together. Compare each line with NEC Article 220. If a section number was not taken from the book or the adopted code, mark it unverified.
What this page does not do
It does not replace a permit, a manufacturer instruction, or the judgment of the person who signs the document. Northline Electric in the sample is an illustration, not a real firm.
